NO.12 An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement

NO.13 Your customer plans to add four HPE Synergy frames to an existing management ring Ail installed frames are equipped with two 2-port FLM modules, while new frames will be equipped with 4-port FLM modules.
Which statement about mixing different FLM modules is true?

 
 
 
 

NO.14 Match each HPE OneView network type with its definition.

NO.15 Your customer is implementing an HPE Synergy solution based on three frames.
Click each of the ports that can be used to connect satellite modules.

NO.16 Which statement about login redistribution is true?

 
 
 
 

NO.17 Match HPE Superdome Flex system with its specific feature.

NO.18 Which statement about the HPE D3940 storage module is true?

 
 
 
 

NO.19 Your customer plans to use HPE OneView for VMware vCenter Server to deploy ESXi systems. They created a server profile template that they want to use in HPE OneView.
Put the steps required to configure HPE OneView for VMware vCenter Server on the left into their correct order on the right.

NO.20 Your customer plans to deploy VMware ESXi 7 0 U2 and they are looking for a hardware platform mat wilt allow them to use up to 24 TB of physical memory.
Which HPE compute system meets this customer’s requirements?

 
 
 
 

NO.21 Your customer plans to setup an HPE Synergy solution based on SY480 Gen10 compute nodes with the following connectivity options – SAS connectivity installed in the first fabric – FC connectivity Installed In the second fabric – Ethernet connectivity installed in the third fabric.
Which statement regarding this setup is true?

 
 
 
 

NO.22 Your customer has the following HPE Synergy setup
– 3 HPE Synergy 12000 Frames
– 4 HPE Virtual Connect SE 100 Gb F32 Modules
– 2 HPE Synergy 50 GO Interconnect Link Modules
– 36 HPE Synergy 480 Gen10 Plus compute modules
– 2 HPE Composer 2 modules
Which statement about this setup is true?

 
 
 
 

NO.23 Your customer has a logical enclosure configured using a angle HPE Synergy frame with the following configuration
– two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
– two HPE Synergy Virtual Connect SE 32Gb FC Modules -12 HPE Synergy 480 Gen10 Plus compute nodes with appropriate mezzanine cards They plan to add a new HPE Synergy frame to an existing logical enclosure with the following configuration
– two HPE Synergy Virtual Connect SE 32Gb FC Modules
– two HPE Synergy 20Gb interconnect Link Modules
– Eight HPE Synergy 480 Gen 10 Plus compute nodes with appropriate mezzanine cards Which statement about the planned configuration change is true?

 
 
 
 

NO.24 Click the drop-down menu that will allow you to define the location of the master modules within the logical interconnect group.

NO.25 You configured a vVoI datastore using HPE Storage integration Pack for VMware vCenter.
Which storage object should you check using SSMC to verify whether vVol datastore is configured property?

 
 
 
 

NO.26 What is a limitation when creating a server profile?

 
 
 
 

NO.27 Your customer is trying to grow a VMware duster using HPE OneView for VMware vCenter Server. They get an error and cannot proceed Which tool should you use to troubleshoot the problem?

 
 
 
 

NO.28 Your customer plans to deploy ESXi systems to HPE Synergy and HPE ProLiant servers using HPE OneView for VMware vCenter Server.
Which statement about HPE OneView for VMware vCenter Server functionality is true for this environment?

 
 
 
 